16-2 Troubleshooting startup problems
Overview
Standard 1.0 Modular Option EC Installation and Maintenance Guide November 1999
Overview
Introduction
When you follow the procedures in this section, always go to
the next step as long as the fault persists. When the fault has
cleared, reconnect or replace items as necessary. Then ensure
that the power is on, and replace the panels (unless instructed
otherwise).
Powering down a node
or the system
Several troubleshooting procedures recommend that you power
down a node or the entire system. You can power down a node
that does not contain a utility card at any time without affecting
call activity on other nodes.
If the node to be powered down contains a utility card, you must
power down the entire system.
If you need to power down the entire system, begin by
performing a courtesy down procedure, then disable the nodes,
and finally power down the system. This ensures that users do
not experience abrupt termination of service.
For more information on how to courtesy down nodes and
the system, refer to the System Administration Guide
(NTP 555-7001-301).
If the system has more than one Meridian Mail module, power
off module MM2, followed by module MM1, followed by
module MM0. Power on the modules in the opposite order.
In an AC system, switch off the lower breaker in each module
before the upper breaker. Switch on the breakers in the opposite
order.
CAUTION
Risk of equipment damage
You may blow the fuses on the utility card
if you do not follow the sequence of steps
outlined in this manual to power up or
power down your Meridian Mail system.