Seagate ST3390N Installationsanleitung Seite 146

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 468
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 145
10-24 Installing, cabling, and configuring peripheral devices
Installing and configuring the Guest Administration Console
Standard 1.0 Modular Option EC Installation and Maintenance Guide November 1999
Installing and configuring the Guest Administration Console
Introduction
Use the following steps to install and configure the Guest
Administration Console (GAC).
Note 1: You must have the Hospitality feature installed.
Note 2: You can connect up to two GACs to node 1. You can
connect only one GAC to any other node. The maximum
number of GACs allowed for an entire system is four.
Note 3: If node 1 has a multiple administration terminal (MAT),
you can connect only one GAC to the node.
Installing a GAC
To install a GAC, follow these steps.
Step Action
1 Connect one end of a null modem cable (NTND82AA/AB) to
a connector labeled SLT5-P
x
on the 5-port fanout cable
connected to the Meridian Mail right I/O panel. See “GAC
terminal” on page 10-25. Alternatively, you can connect the null
modem cable to the SLT4-P
x
on the 4-port fanout cable
connected to the Meridian Mail left I/O panel.
This connector, x, must correspond to a port that has been
configured for a GAC.
See “Ports for peripheral devices in an unshadowed system” on
page 10-32, or “Ports for peripheral devices in a shadowed
system” on page 10-34 for the correspondence between fanout
cable connector labels and ports configured during system
installation or modification. See
System Administration Tools
(NTP 555-7001-305) for recommended dataport usage.
2 Connect the other end to the “Comm” connection on the GAC.
Seitenansicht 145
1 2 ... 141 142 143 144 145 146 147 148 149 150 151 ... 467 468

Kommentare zu diesen Handbüchern

Keine Kommentare