
Adding a node 14-17
Four- to five-node expansion (unshadowed)
Standard 1.0 Modular Option EC Installation and Maintenance Guide November 1999
5 If you are going to have more than 72 ports, install a fourth
network loop cable from the Meridian 1 switch to the J5
connector on the backplane of module MM1. See Chapter 11,
“Installing the Meridian Mail to PBX interface,” for details.
Note:
Insert new hardware for expansion, in slots as indicated
by the shaded areas ( ) in all the figures within this
chapter.
Adding node 5 to an unshadowed system
6 Remove and install VP4 or VP8 cards as necessary to meet the
following criteria:
Module 0
• Install 24 ports in slots 8 to 11.
• Install 24 ports in slots 0 to 3.
Module 1
• Install 24 ports in slots 0 to 3.
• Install a maximum of 24 ports in slots 8 to 11.
Note:
Fill up the voice card slots: start from the left in a given
node and begin with any VP8 cards designated for that node.
Step Action
0
VP/
GP
12345
Util
109
MSU1
MSU3 MSU5
CE
Power
Supply
Node
Y
Node X/Y Node ZMeridian Mail
Module
Node
X
CE
Power
Supply
6
MSU4MSU2
78 11
MMP
40
MMP
40
MMP
40
VP/
GP
0
VP/
GP
12345
Util
109
MSU1
MSU3 MSU5
CE
Power
Supply
Node
Y
Node X/Y Node ZMeridian Mail
Module
Node
X
CE
Power
Supply
6
MSU4MSU2
78 11
MMP
40
MMP
40
MMP
40
VP/
GP
Module 0
Module 1
G100068
Kommentare zu diesen Handbüchern